Terminado aquí
16 proyectos terminadosFuente: 2026 Facilities Master Plan Update, Summary of Accomplishments (borrador pendiente de aprobación del distrito).
Auditorio; complejo deportivo; instalación acuática; Edificio T; sala de pesas.
Aspecto destacado: lista de proyectos de Tilden Coil; informes de avance de la Medida P
Panel de instalaciones y proyectos de Etiwanda High School
Panel pendiente de datos del distrito.
Proyectos terminados en esta escuela
-
-
Athletic Facilities and Parking Lot
-
Auditorium and Classroom Building B
-
Building J Modernization
-
Classroom Building S
-
Classroom Building T
-
EHS Marquee and Parking Lot Expansion
-
Food Service Temp Portables
-
Gym Bleachers Building D
-
Modernization Buildings A, C, E, H, and K
-
MPR Modernization Building F
-
Portable Infrastructure
-
Quad Renovation and Shade Structures
-
Restroom Building
-
Security Fencing
-
Weight Room Building U
Fuente: 2026 Facilities Master Plan Update, Summary of Accomplishments (borrador pendiente de aprobación del distrito).
Otros proyectos documentados
Licitaciones, solicitudes de propuestas y trabajos propuestos, con el estado indicado en la fuente.
-
Modernization (Phase 1: Buildings E and K; Building A labs)
- Alcance según la fuente
- Campus modernization; first phase covers Buildings E and K, with further phases for the balance of the campus.
- Arquitecto
- Pendiente de verificación
- Estado según la fuente
- Latest report through 1/31/2023: Building A labs casework, fume hoods and electrical trim installed.
- Fecha clave
- 1/31/2023 (latest report)
- Fuente
- Measure P project page
Ver la fuente (se abre en una pestaña nueva)
-
Two Story Classroom Building
- Alcance según la fuente
- Two story classroom building with elevator, HVAC, fire alarm, PA, AV and exterior site work.
- Arquitecto
- Pendiente de verificación
- Estado según la fuente
- Latest report through 5/31/2020: punch list in progress; startup and commissioning next.
- Fecha clave
- 5/31/2020 (latest report)
- Fuente
- Measure P project page
Ver la fuente (se abre en una pestaña nueva)
Plan Maestro de Instalaciones de 2012
Ampliaciones planificadas en 2012
| Ampliación planificada en 2012 | SF planificados | Costo estimado en 2012 | Proyecto relacionado |
|---|---|---|---|
| Athletic Field Complex | Pendiente de verificación | $10,000,000 | Athletic Complex, completed January 2016 |
| New Auditorium Building | 18,500 | $9,250,000 | Auditorium (with classroom wings), 98,000 SF, completed May 2019 |
| New Classroom / Support Addition (replace portables) | 50,000 | $12,500,000 | Two Story Classroom Building (2020) and Building T (August 2023) |
| New Classroom / Support Addition (replace portables) | 30,000 | $7,500,000 | Aún sin correspondencia |
| Inclement Weather Shelter | 4,000 | $400,000 | Aún sin correspondencia |
| Renovated Swimming Pool Complex | Pendiente de verificación | $2,500,000 | Aquatic Facility, completed March 2022 |
| Food Service Facility | 5,000 | $1,750,000 | MPR reconfigured for food service (Building J Mod and MPR), July 2021 |
| Existing Playfield Improvements | Pendiente de verificación | $500,000 | Aún sin correspondencia |
| Parking Lot Reconfiguration | Pendiente de verificación | $500,000 | Aún sin correspondencia |
Las correspondencias están pendientes de verificación del distrito.
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)
Plan Maestro de Instalaciones de 2012
Edificios
| Edificio | Uso | Pies cuadrados |
|---|---|---|
| A | Classrooms | 38,900 |
| B | Portables | Pendiente de verificación |
| C | Trade Shops | 25,500 |
| D | Physical Education | 25,100 |
| E | Locker Rooms | 12,800 |
| F | Multipurpose | 10,600 |
| G | Classrooms | 9,700 |
| H | Drama / Art | 12,500 |
| J | Library / Classrooms | 47,400 |
| K | Music / Food Service | 15,000 |
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)
Plan Maestro de Instalaciones de 2012
Datos de 2012
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)
Fuente: Plan Maestro de Instalaciones de 2012 (2012 Facilities Master Plan)