Completed projects at this school
-
Building P (2 Story Classroom)
- Scope as described in source
- New building replacing portables with 12 classrooms, elevator access, restrooms, electrical yard, gates and ramps.
- Architect
- GO Architects
- Status as stated in source
- Completed July 2023 (per program manager).
- Key date
- July 2023
- Source
- Tilden Coil; Measure P project page
View source (opens in a new tab)
-
Site Projects (parking, ADA, fencing, bleachers)
- Scope as described in source
- Parking lot and ADA improvements, walkways, perimeter fencing and gates, north bleacher additions.
- Architect
- Pending verification
- Status as stated in source
- Latest report 3/31/2016: parking, fencing, gates and bleachers complete.
- Key date
- 3/31/2016 (latest report)
- Source
- Measure P project page
View source (opens in a new tab)
-
District Wide Shade Structures
- Scope as described in source
- Shade structures with slab on grade and CMU surrounds at three sites.
- Architect
- Pending verification
- Status as stated in source
- As of 7/31/2015: erection complete at all three sites.
- Key date
- 7/31/2015
- Source
- Measure P school pages
View source (opens in a new tab)
Other documented projects
Bids, RFPs and proposed work, with status as stated in source.
No projects in this group are listed in the Projects tab for this school.
2012 Facilities Master Plan
2012 planned additions
2012 planned additions, Los Osos High School | 2012 planned addition | Planned SF | 2012 estimated cost | Related project |
| Inclement Weather Shelter | 4,000 | $400,000 | Not yet matched |
Matches are pending district verification.
Source: 2012 Facilities Master Plan
2012 Facilities Master Plan
Buildings
Buildings, Los Osos High School, 2012 Facilities Master Plan | Building | Use | Square feet |
| A | Administration / Library | 27,900 |
| B | Physical Education | 45,900 |
| C | Classrooms | 73,900 |
| D | Labs / Classrooms / Trade Shops | 83,100 |
| E | Food Service / MPR | 18,200 |
| F | Performing Arts | 31,200 |
| Portables | Portables | 6,000 |
Source: 2012 Facilities Master Plan
2012 Facilities Master Plan
2012 facts
55 acres
Site area
Source: 2012 Facilities Master Plan
2002
Year opened
Source: 2012 Facilities Master Plan
286,200 SF
Existing square footage
Source: 2012 Facilities Master Plan
2,430
Capacity at 27 per room
Source: 2012 Facilities Master Plan
3,210
2012 enrollment (campus page)
Source: 2012 Facilities Master Plan
3,365
2012 enrollment (capacity table)
Source: 2012 Facilities Master Plan
Campus photo
[Aerial photo of the campus to be provided.]