Rancho Cucamonga High School facilities and projects dashboard Dashboard pending district data.
Completed projects at this school Building P and Cooling Tower Scope as described in source Building P and cooling tower work. Architect Pending verification Status as stated in source Latest report through 4/30/2024: EIFS and plaster, signage, MEP trim, ceilings, painting and flooring completed in April 2024. Key date 4/30/2024 (latest report) Source Measure P project pages (two pages: "Bldg. P & Cooling Tower" and "Bldg P") View source (opens in a new tab) New Classroom Addition (Building V) Scope as described in source Two story wood framed classroom building with a two story elevator tower and site improvements. Architect GO Architects Status as stated in source Completed August 2023 (per program manager). Key date August 2023 Source Tilden Coil; Measure P project page View source (opens in a new tab) Modernizations (Phases 1 to 7) Scope as described in source Modernizes five single story modular buildings, three two story and three three story classroom buildings; eight shade structures; campus fire alarm upgrades; quad and pool deck. Architect PJHM Architects Status as stated in source Completed April 2022 (per program manager); final Phase 7 complete. Key date April 2022 Source Tilden Coil; Measure P project page View source (opens in a new tab) Classroom Building (2 Story) Scope as described in source Two story wood framed building adding 12 classrooms, elevator tower and ADA upgrades to four restrooms. Architect GO Architects, Inc. Status as stated in source Completed December 2017 (per program manager). Key date December 2017 Source Tilden Coil; Measure P project page View source (opens in a new tab) Auditorium Scope as described in source New 800 seat auditorium with two classrooms, scene shop, drama and choral rooms; ADA path of travel; quad upgrades; Building U modernization. Architect WLC Architects Status as stated in source Completed September 2017 (per program manager). Key date September 2017 Source Tilden Coil; Measure P project page View source (opens in a new tab) Athletic Complex Scope as described in source New 5,000 seat football stadium, synthetic field and track, lighting, scoreboard, press box, 220 stall parking lot. Architect WLC Architects Status as stated in source Completed January 2016 (per program manager). Key date January 2016 Source Tilden Coil; Measure P project page View source (opens in a new tab) Under construction at this school Building DM Modernization (Buildings D and M) Scope as described in source Modernization of Building D and Building M, including demolition, MEP rough ins, drywall, HVAC and framing. Architect Pending verification Status as stated in source In construction. Latest report through 12/31/2025: first floor door infill concrete done; office drywall finished; second floor taping began. Key date 12/31/2025 (latest report) Source Measure P project page View source (opens in a new tab) Building U Scope as described in source Construction of Building U after demolition of the existing building: CMU block walls, electrical rough in, steel erection, footings and elevator footings. Architect Pending verification Status as stated in source In construction. Latest report through 11/30/2025: CMU block installation complete; steel erection and grouting began. Key date 11/30/2025 (latest report) Source Measure P project page View source (opens in a new tab) Other documented projects Bids, RFPs and proposed work, with status as stated in source.
No projects in this group are listed in the Projects tab for this school.
2012 Facilities Master Plan
2012 planned additions 2012 planned additions, Rancho Cucamonga High School 2012 planned addition Planned SF 2012 estimated cost Related project Athletic Field Complex Pending verification $10,000,000 Athletic Complex, completed January 2016 Tennis Courts / Parking Structure 57,600 $8,640,000 Not yet matched New Auditorium Building 18,500 $9,250,000 Auditorium, completed September 2017 Inclement Weather Shelter 4,000 $400,000 Not yet matched Renovated Swimming Pool Pending verification $2,500,000 Not yet matched Existing Playfield Improvements Pending verification $500,000 Not yet matched
Matches are pending district verification.
Source: 2012 Facilities Master Plan
2012 Facilities Master Plan
Buildings Buildings, Rancho Cucamonga High School, 2012 Facilities Master Plan Building Use Square feet A Trade Shops / Labs 11,100 B/C Classrooms 7,400 D Library 14,000 E/F Classrooms 12,700 G/H Classrooms / Science 49,500 K/L Classrooms / Food Service 10,700 M Multipurpose 13,300 N Administration 13,500 P/Q Classrooms 6,500 R Classrooms 7,800 S Physical Education 47,800 T Classrooms 25,500 U/V Music / Classrooms 8,200 W/Y Grounds / Storage 9,000
Source: 2012 Facilities Master Plan
2012 Facilities Master Plan
2012 facts 39 acres
Site area
Source: 2012 Facilities Master Plan
1990
Year opened
Source: 2012 Facilities Master Plan
237,000 SF
Existing square footage
Source: 2012 Facilities Master Plan
2,592
Capacity at 27 per room
Source: 2012 Facilities Master Plan
2,981
2012 enrollment (campus page)
Source: 2012 Facilities Master Plan
3,153
2012 enrollment (capacity table)
Source: 2012 Facilities Master Plan
Campus photo [Aerial photo of the campus to be provided.]