Completed here
9 completed projectsSource: 2026 Facilities Master Plan Update, Summary of Accomplishments (draft pending district approval).
HVAC upgrades at Buildings B and C; shade structures.
Highlight: Tilden Coil project list; Measure P progress reports
Montclair High School facilities and projects dashboard
Dashboard pending district data.
Completed projects at this school
-
-
Gym HVAC Upgrades Building D
-
Marquee and Parking Lot Expansion
-
Pressbox and Bleacher Expansion
-
Security Fencing
-
Shade Structures
-
Stadium Bleachers
-
Swimming Pool
-
Track/Field Resurfacing
Source: 2026 Facilities Master Plan Update, Summary of Accomplishments (draft pending district approval).
Under construction at this school
-
New Gymnasium (Building I)
- Scope as described in source
- New gymnasium of about 31,100 SF with three hardwood basketball courts, seating for about 1,834, lobby with concessions, restrooms, team and training rooms, weight room, storage and office; existing hardtop courts relocated.
- Architect
- Pending verification
- Status as stated in source
- In construction. Latest report through 12/31/2025: 8 inch CMU walls complete; Main Gym 12 inch walls at 31 ft 4 in of 36 ft; lower roof steel started.
- Key date
- 12/31/2025 (latest report)
- Source
- CEQA NOE 9/16/2024; Bid No. 24/25-025 (closed 5/6/2025); Measure P progress reports 8/2025 to 12/2025
View source (opens in a new tab)
Other documented projects
Bids, RFPs and proposed work, with status as stated in source.
-
Swimming Pool Improvements and Press Box and Bleacher Addition
- Scope as described in source
- Pool and equipment replaced; about 1,000 new bleacher seats; new press box with elevator.
- Architect
- Pending verification
- Status as stated in source
- Pool turned over to the site 8/26/2015.
- Key date
- 8/26/2015
- Source
- Measure P school page
View source (opens in a new tab)
2012 Facilities Master Plan
2012 planned additions
| 2012 planned addition | Planned SF | 2012 estimated cost | Related project |
|---|---|---|---|
| Inclement Weather Shelter | 4,000 | $400,000 | Not yet matched |
| Renovated Swimming Pool | Pending verification | $2,500,000 | Swimming Pool Improvements, turned over August 2015 |
| Expanded Student Support Services | 2,000 | $500,000 | Not yet matched |
Matches are pending district verification.
Source: 2012 Facilities Master Plan
2012 Facilities Master Plan
Buildings
| Building | Use | Square feet |
|---|---|---|
| A | Administration | 10,300 |
| B | Auditorium | 25,600 |
| C | Food Service | 11,700 |
| D | Physical Education | 36,600 |
| E | Classrooms | 33,600 |
| F | Classrooms / Science | 36,000 |
| G | Trade Shops | 20,300 |
| M | Music | 2,900 |
| N | Library / Classrooms | 27,700 |
| S | Classrooms | 22,100 |
| T | Maintenance Shop | 1,200 |
| X | Dougherty | 9,000 |
Source: 2012 Facilities Master Plan
2012 Facilities Master Plan
2012 facts
Source: 2012 Facilities Master Plan
Source: 2012 Facilities Master Plan
Source: 2012 Facilities Master Plan
Source: 2012 Facilities Master Plan
Source: 2012 Facilities Master Plan
Source: 2012 Facilities Master Plan
Campus photo
[Aerial photo of the campus to be provided.]